Posted Tue, 13 Sep 2011 00:07:41 GMT by William BROOKS Pinnacle Drafting Owner
I want to change the "date of Order" under the "project info 2" heading  for the drawings in my model, but changing the date then "updating page header" is not changing the original date that is already there. I tried changing it manually in the drawing but it switches back to the original date if the header gets updated. How do I change it permanently?

Thanks

Bill
Posted Tue, 13 Sep 2011 18:54:46 GMT by
Bill if you were to get an answer please let me know. 
Posted Tue, 18 Oct 2011 15:10:47 GMT by Steve Adams Adams Business Services Owner

Bill,

The attribute in your Page header of the prototype needs to be changed.  It is set to DATE_DRAW, which is Date of created drawing.  To get it to use the Date of order change the attribute to DATE_ORDER.  This will change the date to what you want to set the new date to, with a page header update.

 

Steve

You must be signed in to post in this forum.

GRAITEC Services
Training
Consultancy
Development
Free Trial
GRAITEC Products
Advance Design
Advance Workshop
Advance BIM Designers
PowerPack for Revit®
PowerPack for Advance Steel
Autodesk Products
Collections
Subscriptions
Cloud services
Advance Steel
Revit®
Autocad®

GRAITEC GROUP 2018 | WE'VE UPDATED OUR PRIVACY NOTICE - Click here to find out more about how we collect, store and handle your personal data and your rights.