Posted Mon, 08 Apr 2013 11:19:19 GMT by
When a project is finished and all drawings have been issued, is there a way you can separate those issued drawings so that it will still be in your document manager if it needs an new revision at a later stage? What is the purpose of the issue button in document manager?
Posted Mon, 08 Apr 2013 17:12:30 GMT by Dumitru BERTEANU Graitec ROMANIA
The issue drawings checkbox helps you to :
- sort the drawing list inside Document manager, on the left side of the dialog. The issue drawings will not create a totally new category in DM - the drawings will still be in the Current or Update required category, based on the necessity.
- the checkbox can help you to create a detail drawing list ( a BoM template list that display all the created drawings, case in which you can use the Issue Drawing parameter to either sort the list, display this information in the list and so on).
- issued drawings can still be updated, if needed. If you made a modification the model that influenced an issue drawing, then it will appear normally in the Update Required category, and it will update if you choose to do the update to the whole category. 
Posted Thu, 11 Apr 2013 05:07:10 GMT by

Dear Clinton,

When a drawing is released for fabrication, you can mark it as "Issued" with the "Issue" button in the Document Manager.

Regards

Philippe

You must be signed in to post in this forum.

GRAITEC Services
Training
Consultancy
Development
Free Trial
GRAITEC Products
Advance Design
Advance Workshop
Advance BIM Designers
PowerPack for Revit®
PowerPack for Advance Steel
Autodesk Products
Collections
Subscriptions
Cloud services
Advance Steel
Revit®
Autocad®

GRAITEC GROUP 2018 | WE'VE UPDATED OUR PRIVACY NOTICE - Click here to find out more about how we collect, store and handle your personal data and your rights.