Views:

Advance Concrete provides the option to renumber the reinforcement bars for more than one view or even for the entire project.
Due to the changes that appear during the detailing of a project, the numbering is applied several times before finalizing the drawings. The numbering is done by accessing the "Renumbering" command on the "Reinforcement" ribbon.

How are the reinforcement bars renumbered in several drawings or in the entire project?


The same tree from the Pilot is present in the "Renumbering" window.

How are the reinforcement bars renumbered in several drawings or in the entire project?


The "Reset all marks" option is set as default. Each reinforcement element will receive a mark and the ones that are identical will get the same mark. For a numbering on several drawings select the views in the "renumbering" window.

How are the reinforcement bars renumbered in several drawings or in the entire project?


The bars from the drawings selected in the tree will be compared and the identical bars will receive the same mark. The selection of all the drawings in a project is done with the "Select all" option.

How are the reinforcement bars renumbered in several drawings or in the entire project?


For projects made with the "Split" option active, the drawings that are opened for "renumbering" will be closed. Right after the numbering is finished Advance Concrete will save and close all the drawings that were automatically opened.

How are the reinforcement bars renumbered in several drawings or in the entire project?


The numbering process will compare all the characteristics (geometry, diameter, steel grade) and will give the same mark to identical characteristics even if they do not belong to the same drawing.
This feature is available both in projects that use external DWG files for the views and in the ones that use a single DWG for the entire project.


Related Products Autodesk Advance Concrete