After defining the model, the user must create the structure model views.

How are the post-processing views used

The views are created using the "Save view" option on the "Modeling" toolbar. The structure is rotated in order to obtain the views from the desired angles (front view, back view, top/bottom views and isometric views of the structure). The views are automatically created in the "Pilot".

How are the post-processing views used

The views are accessed by double-clicking a view item in the "Pilot". The structure will be automatically rotated in the position in which the view was created. The views can be replaced, renamed, erased, locked, unlocked or updated.
For example, to rename a view select it and right click, and then select the "Rename" option from the context menu.

How are the post-processing views used

How are the post-processing views used









If the structure is modified, the views can be updated. Select the views and use the "Update" option from the context menu. After the structure is modified, the view in the "Pilot" becomes red. You can easily see that the views must be updated for the modified structure. After the views are update the pilot items become green.










After the structure is analyzed, you can save the post-processing views with the results. From the "Analysis-E.F.Results" toolbar use the "Save view" option.

How are the post-processing views used

The saved results views will appear in the "Pilot" in the "Post-processing" category .

How are the post-processing views used

How are the post-processing views used

The views saved in the Analysis mode can be replaced, locked, unlocked, erased, renamed, displayed or updated. For example, for the "1.Deplacement D 140" post-processing view, the "Shaded faces" rendering mode can be replaced with a representation by axes.

How are the post-processing views used

The "1.Deplacement D 140" view must be selected, and on the "Rendering" toolbar, the "Axes" mode must be selected. Next, right click, and select the "Replace" option. You can replace all the saved views.

How are the post-processing views used

If the "Lock" option is used, you will not be able to replace, display or update the saved views. When a saved view is locked, the pilot item is gray. To be able to display, update or replace the views you must use the "Unlock" option.

How are the post-processing views used

How are the post-processing views used


In the "Post-processing" category, you can create groups using the "Create a group" option. For example, you can create a group for the post-processing views.

How are the post-processing views used

Select views 2 and 3 and then use the "Cut" option. Next, select the "Forces" group and then select the "Paste" option from the context menu. The views can be moved from a category to another. This procedure can also be done using the drag-and-drop option.

How are the post-processing views used

The saved views can be inserted in the document report.
In the "Document" mode you can view all the saved views from the "Model" or from the "Analyze" mode. Also, in the "Pilot" you can see the path to the directory where the views are saved.

How are the post-processing views used

GRAITEC Services
Training
Consultancy
Development
Free Trial
GRAITEC Products
Advance Design
Advance Workshop
Advance BIM Designers
PowerPack for Revit®
PowerPack for Advance Steel
Autodesk Products
Collections
Subscriptions
Cloud services
Advance Steel
Revit®
Autocad®

GRAITEC GROUP 2018 | WE'VE UPDATED OUR PRIVACY NOTICE - Click here to find out more about how we collect, store and handle your personal data and your rights.