Posted Tue, 15 Apr 2014 14:18:35 GMT by Nenad

Hi all
I have many assemblies modeled, with the drawings done.
Now, I got a revision which requires me to change the tube diameter, but I have to "move radially" the reinforcement plates as well.
Please see the picture:
Name:  Radial Stretch.pngViews: 0Size:  8.0 KB
I have to change a tube dimension from red to green, and I have to "move radially" the yellow plates to touch the green tube.

What is the easiest way to do it for 100+ assemblies?

Thanks in advance,

Nenad

Attachment: Radial Move_0.zip

Posted Thu, 17 Apr 2014 16:29:41 GMT by Alick O'May Peter Mitchell and Sons draftman

if your 100+ models are sepret files  i think u will have to do 100+ tube size chages and 400+ moves 

if thay all in same file model then u could do it in 5 operations  (+ a hell of a lot of selecting the rite plate)

You must be signed in to post in this forum.

GRAITEC Services
Training
Consultancy
Development
Free Trial
GRAITEC Products
Advance Design
Advance Workshop
Advance BIM Designers
PowerPack for Revit®
PowerPack for Advance Steel
Autodesk Products
Collections
Subscriptions
Cloud services
Advance Steel
Revit®
Autocad®

GRAITEC GROUP 2018 | WE'VE UPDATED OUR PRIVACY NOTICE - Click here to find out more about how we collect, store and handle your personal data and your rights.